Fee Schedule

Building Permit Fees:

Residential - New Construction - $0.07 per SF finished space min. $50.00 max. $175.00

Residential - Alteration - $15 first $5,000 plus $1 per $1,000 after

Commercial- New Construction/Remodel - $0.07 per SF finished space min. $100.00 max. $400.00

Electrical/Mechanical/Plumbing (each)

  • $15.00 residential
  • $30.00 commercial
  • $75.00 industrial

Accessory Structures (i.e. sheds, decks, etc.) - $15.00

Demolition Permit - $10.00

Excavation Permit - $20.00

Boring Permit - $25.00

Mobile Home Installation - $20.00

Sign Permit - $10.00

Temporary Off Premises Sign - $50.00 ($500.00 Refundable Deposit)

Above Ground Pool Permit - $10.00

In Ground Pool Permit - $25.00

Driveway - Curb Cut

  • $75.00 residential
  • 125.00 Commercial

Plan Review - No Charge

Inspection Fees

(16.24.050)

  • Sewer Lines - $1.00 per lineal ft.
  • Water Lines - $.50 per lineal ft.

Planning and Zoning:

  • Planning and Zoning Special Use Permit - $100.00
  • Planning and Zoning Rezoning Request - $100.00
  • Planning and Zoning Preliminary Plat - $25.00
  • Planning and Zoning Final Plat - $44.00 1st page ($25 each additional page)
  • Planning and Zoning Boundary Adjustment - $44.00
  • Board of Adjustment Request - $40.00

Water Charges:

Service Connection or Tap Charges (Section 13.12.070)

  • • tapping onto 4” 6” and 8” lines - $485.00
  • • tapping onto 10” lines - QUOTE *
  • • tapping onto 18” lines - QUOTE *

(*cost per current rate of brass)

Meter Testing (Section 13.12.470)

  • charge for residential meter testing - $150.00

Gas Charges:

Tap and Service Connection Fees (Section 13.24.040)

  • tapping onto lines - No Charge

Service Pipe (over 75 feet) (Section 13.24.070)

  • 3/4" 1" or 2” line - $3.50/ft
  • 3" line - $4.00/ft
  • 6” line - $12.00/ft

Test Fees (Section 13.24.460)

  • charge for testing meter - $150.00

Sewer Charges:

Connection Fees – tapping onto (Section 13.16.040)

(Note: These rates may not be altered unless Section 13.16.040 of the Code is revised)

• ¾” service line - $890.00

• 1” service line - $1,333.00

• 1 ½” service line - $2,460.00

• 2” service line - $3,812.00

• 3” service line - $6,959.00

• 4” service line or larger - $13,700.00

City Cost/Share Program

Project Dry Basement - $1,500 max

Residential Sidewalk Installation Program - $25.00/linear foot

Zoning Fees

Preliminary plat filing fee = $25.00

Final plat filing fee =$ 44.00 (for 1st page) and $25.00 (for additional pages)

Rezoning Application fee = $100.00

Special Use Permit Application fee = $100.00

Variance Application fee = $40.00